# The WOW Tower by Mr. Eight, DLRC — Prices & Payment Plans | WIZI PREMIUM

> The WOW Tower launch: Mr. Eight's tower in DLRC. Studios from $200K (AED 748K), 50/50 and post-handover plans; matching DLD filing #4534 approved 8 Oct 2026.

> Canonical (HTML): https://wizipremium.com/projects/the-wow-tower-mr-eight-dlrc.html
> Markdown twin generated from the live page content. Date: 2026-10-25

---

By WIZI PREMIUM · Updated 25 October 2026

In short

The WOW Tower is a mixed-use tower by Mr. Eight Development in Dubailand Residence Complex (DLRC). Above the ground floor it stacks five parking podium levels, fifteen office floors, one lounge floor for office staff, 22 residential floors and a rooftop. The broker card gives no DLD number, but one register filing matches it by name, location, height and completion date: project #4534 “The Wow Tower”, approved by the Dubai Land Department on 8 October 2026 and registered to Riviera Vista Real Estate Development L.L.C, with 1,382 units, an escrow account opened and completion filed for 30 September 2029. The launch price list in broker launch data of 25 October 2026 starts at $200K (AED 748K) for a studio, $305K (AED 1,124,000) for a 1-bedroom and $515K (AED 1,901,000) for a 2-bedroom; offices start at $735K (AED 2,713,200). Per broker launch data the expression of interest (EOI) is $19K (AED 70K), and the sales date will be announced later.

Sources: broker launch data (GenieMap), 25 Oct 2026 — card 7822: description, tower configuration, price list by layout, payment plans, EOI, handover · DLD projects register, snapshot 24 Oct 2026 (#4534 and neighbouring filings in Wadi Al Safa 5) · WIZI PREMIUM, RERA ORN 60234

DLD projects register · 24 Oct 2026

## Project #4534 in the DLD register

| Project number | 4534 — “The Wow Tower” |
|---|---|
| Registered developer | Riviera Vista Real Estate Development L.L.C (the register does not show the Mr. Eight brand) |
| DLD area | Wadi Al Safa 5 (Dubailand Residence Complex) · Dubai Development Authority zone |
| As described in the filing | G+43 mixed-use tower |
| Approved | 8 Oct 2026 |
| Status | Active |
| Units in the filing | 1,382 |
| Escrow account | Opened |
| Construction start (filed) | 4 Feb 2027 |
| Planned completion (filed) | 30 Sep 2029 |
| Project value (filed) | AED 400M |
| Construction progress | 0% at DLD's inspection on 1 Oct 2026 — a week before approval |

Why we treat #4534 as Mr. Eight's tower: the broker card has no DLD number, so the link rests on four matches — the name, the location (DLRC lies in the register area Wadi Al Safa 5), the height (the developer's G+5P+15C+A+22+R is 43 floors above ground, the filing says G+43) and the timing (completion filed for 30 Sep 2029, developer handover 28 Sep 2029). The same entity is also the registered developer of #4388 Villa del Garda Residences in Palm Deira (134 units, approved 18 Mar 2026). The tower already appears in our [off-plan completion tracker](https://wizipremium.com/dubai-offplan-completion-tracker.html).

Source: Dubai Land Department open data — projects register, snapshot 24 Oct 2026 (project #4534). Construction start and completion are the dates the developer filed with DLD; they can move. Project value is the figure declared in the register, not a sales total. The escrow account number is in the register; we do not reproduce it here.

25 Oct 2026 · status check

## Settled already vs still open

### Settled

- Matching DLD filing #4534 “The Wow Tower”: approved 8 Oct 2026, active, escrow account opened
- G+43 mixed-use tower with 1,382 units in the filing; completion filed for 30 Sep 2029
- Launch price list for five layouts: studio, 1 BR, 2 BR, office, retail
- Six payment plans; the AED 70,000 booking fee sits inside the 20% paid on the SPA
- Freehold; built-in Bosch kitchen appliances in every residence

### Open on 25 Oct 2026

- Sales date — “will be announced later”
- Unit sizes and floor plans by layout
- Unit and basis of the “25” service charge
- Which company signs the SPA: the Mr. Eight brand or Riviera Vista, the entity in the register
- How the 1,382 units split between apartments, offices and retail
- How residents' and office tenants' entrances and lifts are separated

Tower configuration · G+5P+15C+A+22+R

## What sits on each level

| Level | Floors | Use |
|---|---|---|
| Ground (G) | 1 | Ground floor — use not detailed in the launch data |
| Podium (5P) | 5 | Parking |
| Commercial (15C) | 15 | Offices and professional services |
| Amenity (A) | 1 | Lounge reserved for office employees |
| Residential (22) | 22 | Studios, 1- and 2-bedroom apartments |
| Rooftop (R) | — | Leisure areas |

Counted above the ground floor, that is 5 + 15 + 1 + 22 = 43 floors — the same height the DLD filing gives (“G+43 mixed-use tower”). In the order the developer lists them, the apartments sit above the office floors. The developer describes a wave-shaped façade, large panoramic windows and a fully fitted kitchen with built-in Bosch appliances in all residences; finishes are listed as “Lux” and semi-furnished with kitchen appliances.

Amenities named in the broker card include an adults' pool and pool deck, cabanas, a shared gym and an open-air gym, sauna, steam room and spa, an indoor cinema, a coworking zone and meeting room, padel and tennis courts, a kids' play area, roof gardens and covered parking; pets are listed as allowed. The final list will be in the sales documents.

Source: developer description and configuration via broker launch data (GenieMap), 25 Oct 2026; DLD projects register, snapshot 24 Oct 2026.

Launch price list · broker data, 25 Oct 2026

## Prices by layout

| Layout | From | To | Average AED per sq ft |
|---|---|---|---|
| Studio | $200K (AED 748,000) | $225K (AED 833,000) | 1,674 |
| 1 bedroom | $305K (AED 1,124,000) | $385K (AED 1,424,000) | 1,668 |
| 2 bedrooms | $515K (AED 1,901,000) | $655K (AED 2,421,000) | 1,598 |
| Office | $735K (AED 2,713,200) | $1.78M (AED 6,568,800) | — |
| Retail | $3.38M (AED 12,442,500) | $9.44M (AED 34,701,450) | — |

Across all layouts the price list runs from AED 1,496 to AED 3,165 per sq ft (average AED 1,898), and units range from 406 sq ft to 11,051 sq ft. The card does not give sizes per layout, so ask for the floor plan of the exact unit before comparing prices.

For context, the same broker database averages AED 1,699 per sq ft for DLRC studios, AED 1,491 for 1-bedrooms and AED 1,409 for 2-bedrooms: WOW studios sit close to the district figure, the larger apartments above it. More on prices in the area: [Dubailand Residence Complex](https://wizipremium.com/areas/dubai-land-residence-complex.html); for entry-level units across the city see [studios in Dubai](https://wizipremium.com/buy/studios-dubai.html).

Source: launch price list by layout in broker launch data (GenieMap), 25 Oct 2026, card 7822. Dollar figures are rounded down from AED at 3.6725. Prices can change when sales open.

Payment plans · developer, via broker data

## Payment plan 1: 50% before completion, 50% on it

| When | Share of price | Note |
|---|---|---|
| On signing the SPA | 20% + 4% DLD fee + AED 5,000 admin fee | Includes the AED 70,000 booking fee |
| Within 6 months of booking | 5% | Booking date depends on the sales date, not yet announced |
| Within 12 months of booking | 5% |  |
| At 30% construction | 10% | Construction start filed with DLD for 4 Feb 2027 |
| At 75% construction | 10% | Track progress in the DLD register |
| On completion | 50% | Developer handover 28 Sep 2029; DLD filing 30 Sep 2029 |

What that means in money for the entry unit of each apartment layout:

| Unit (entry price) | Price | Due on signing: 20% + 4% DLD + AED 5,000 | Instalments before completion (30%) | On completion (50%) |
|---|---|---|---|---|
| Studio | $200K (AED 748,000) | $50K (AED 184,520) | $61K (AED 224,400) | $100K (AED 374,000) |
| 1 bedroom | $305K (AED 1,124,000) | $74K (AED 274,760) | $91K (AED 337,200) | $150K (AED 562,000) |
| 2 bedrooms | $515K (AED 1,901,000) | $125K (AED 461,240) | $155K (AED 570,300) | $255K (AED 950,500) |

The other five plans, as listed in the launch data:

| Plan | For | Before completion | On completion | After handover |
|---|---|---|---|---|
| 5 | No label | 50% (20 + 5 + 5 + 10 + 10) | 10% | 40% within 18 months (15% + 15% + 10%) |
| 6 | No label | 50% (20 + 5 + 5 + 10 + 10) | 10% | 40% within 36 months (10% + 10%, then 5% four times) |
| 2 | Retail | 35% (20 + 5 + 5 at 20% built + 5 at 75% built) | 65% | — |
| 3 | Retail | 40% (20 + 5 + 5 at 20% built + 10 at 75% built) | 10% | 50% within 18 months (18% + 16% + 16%) |
| 4 | Retail | 40% (20 + 5 + 5 at 20% built + 10 at 75% built) | 10% | 50% within 36 months (10% four times, then 5% twice) |

Every plan starts the same way: 20% on the SPA including the AED 70,000 booking fee, plus the 4% DLD fee and the AED 5,000 admin fee. The EOI in the launch data is also AED 70,000 — ask whether it is credited as the booking fee, and get its refund terms in writing. Payment methods listed: bank transfer, bank cheque, debit or credit card, cash and crypto. How these structures compare with other launches: [Dubai off-plan payment plans](https://wizipremium.com/dubai-off-plan-payment-plans.html).

Source: six developer payment plans in broker launch data (GenieMap), 25 Oct 2026. Plans 1, 5 and 6 carry no unit-type label; plans 2, 3 and 4 are marked “for retail”. Amounts in the example are our arithmetic on the entry prices of the launch price list.

Register area Wadi Al Safa 5

## The other big filings in the same register area

| Project | DLD # | As filed | Units | Approved | Completion (filed) | Built |
|---|---|---|---|---|---|---|
| The Wow Tower | 4534 | G+43 mixed-use tower | 1,382 | 8 Oct 2026 | 30 Sep 2029 | 0% (1 Oct 2026) |
| Rise by Athlon 1 | 4044 | Three residential towers, up to G+2P+27 | 650 | 9 Sep 2025 | 30 Dec 2029 | 0.68% (24 Apr 2026) |
| Sky Line by Peace Homes | 4125 | Residential, commercial and offices: 5B+G+2 podium+4 office floors+24 residential+roof | 565 | 13 Jan 2026 | 30 May 2030 | 0% (25 Sep 2025) |
| Treppan Vision | 4539 | 2B+G+3P+14 | 463 | 27 Aug 2026 | 31 May 2029 | 0% (16 Jul 2026) |
| Rise by Athlon 2 | 4045 | Two residential towers, G+2P+21 and G+2P+24 | 407 | 9 Sep 2025 | 30 Jan 2030 | 0.08% (24 Apr 2026) |

Among these, Sky Line is the closest format — offices under apartments — but with 4 office floors against 15 here. All five are at or near zero progress and are filed to complete between May 2029 and May 2030.

Source: DLD projects register, snapshot 24 Oct 2026 — active filings in the register area Wadi Al Safa 5 approved since September 2025 with 400 or more units. The snapshot lists 50 filings in this area in total, including completed Arabian Ranches III phases. “Built” is the progress at DLD's latest inspection.

Location · DLRC

## Dubailand Residence Complex: the district

The tower is in [Dubailand Residence Complex](https://wizipremium.com/areas/dubai-land-residence-complex.html), a residential district in eastern Dubai along the Al Ain Road and Emirates Road. Broker launch data describes the district as quiet and family-oriented, with good road links to the international airport and Dubai Academic City, local shops, pharmacies and mosques within the blocks, green areas and sports facilities, and schools and universities nearby. Most of the area is modern apartment buildings of various heights.

The developer's description says only that the location gives quick access to key city destinations; it gives no travel times, and neither do we. If offices are what you are weighing, compare with [commercial property across Dubai](https://wizipremium.com/buy/commercial-property-dubai.html).

Source: broker launch data (GenieMap), project and district descriptions, 25 Oct 2026; DLD projects register, snapshot 24 Oct 2026.

Gallery · developer renders

## The WOW Tower in renders

Renders: Mr. Eight Development, via broker launch data (GenieMap), 25 Oct 2026.

Investment view

## Before you reserve: pluses and open points

### In favour

- The matching DLD filing, #4534, was approved on 8 Oct 2026 and has an escrow account opened — before any sales date has been set
- Entry at $200K (AED 748K) for a studio, with a built-in Bosch kitchen in every residence per the developer description
- Besides the 50/50 plan, two more plans without a retail label move 40% of the price to 18 or 36 months after handover (the other three plans are for retail)
- The developer's handover date in broker data (28 Sep 2029) and the completion date filed with DLD (30 Sep 2029) are two days apart
- The largest filing in Wadi Al Safa 5 by unit count in the register snapshot — 1,382 units, more than twice the next one (650)

### Worth knowing

- No sales date yet: the card says it will be announced later, and prices or plans can change when sales open
- Construction start is filed for 4 Feb 2027, which leaves about 32 months to the filed completion for a 43-floor tower; DLD recorded 0% on 1 Oct 2026
- Per sq ft, 1- and 2-bedrooms are priced above the DLRC averages in the same broker database: AED 1,668 vs 1,491 (1 BR) and AED 1,598 vs 1,409 (2 BR)
- The register names Riviera Vista Real Estate Development L.L.C, not the Mr. Eight brand — confirm which entity signs your SPA
- Service charge is listed as “25” with no unit, and sizes by layout are not in the launch data

### Get The WOW Tower price list and factsheets

We will send the price list by layout, the residential and business factsheets and all six payment plans, and tell you as soon as Mr. Eight sets the sales date.

FAQ

## Common questions

**When does The WOW Tower launch?**

No date has been published. Broker launch data of 25 October 2026 has an empty sales-start field and says the launch date will be announced later. What is already set: DLD approved the matching filing, #4534 “The Wow Tower”, on 8 October 2026, and broker launch data lists an EOI of $19K (AED 70K) — get the refund terms in writing before you pay it.

**How much are apartments in The WOW Tower?**

Per the launch price list in broker launch data (25 Oct 2026): studios $200K (AED 748K) to $225K (AED 833K), 1-bedrooms $305K (AED 1,124,000) to $385K (AED 1,424,000), 2-bedrooms $515K (AED 1,901,000) to $655K (AED 2,421,000). Average asking prices are about AED 1,674 per sq ft for studios, 1,668 for 1-bedrooms and 1,598 for 2-bedrooms. There are no 3-bedroom units in the launch data.

**Can I buy an office or a shop in The WOW Tower?**

Yes — fifteen floors are offices. Offices are listed from $735K (AED 2,713,200) to $1.78M (AED 6,568,800), retail units from $3.38M (AED 12,442,500) to $9.44M (AED 34,701,450) (launch price list, broker launch data, 25 Oct 2026). Retail has its own three payment plans, including two with 50% paid over 18 or 36 months after handover.

**What payment plans does The WOW Tower offer?**

Six, per broker launch data. The base plan is 20% on signing the SPA (including the AED 70,000 booking fee) plus the 4% DLD fee and an AED 5,000 admin fee, 5% within 6 months, 5% within 12 months, 10% at 30% construction, 10% at 75% and 50% on completion. Two more plans keep 50% before completion but pay only 10% on completion and 40% over 18 or 36 months after handover; three plans are marked for retail.

**Who is the developer, and is the project registered with DLD?**

It is marketed by Mr. Eight Development, which describes itself as a developer that started in Europe in 2011 and now also builds in Dubai. The DLD register lists The Wow Tower as project #4534, active, approved on 8 October 2026, with an escrow account opened — under the developer entity Riviera Vista Real Estate Development L.L.C. The register does not name Mr. Eight: we link the two because the name, the location (Wadi Al Safa 5, the register area that covers DLRC), the height (G+43) and the completion date (30 Sep 2029 vs the developer's 28 Sep 2029) match. Ask for the SPA party and the escrow details before paying.

**When is The WOW Tower handover?**

Broker launch data gives 28 September 2029; the completion date in the matching DLD filing (#4534) is 30 September 2029. Construction start is filed for 4 February 2027, and DLD's inspection on 1 October 2026 recorded 0% progress. Filed dates can move — check the register before each construction-linked payment.

**How tall is the tower and how many units are there?**

The developer configuration is G+5P+15C+A+22+R: ground floor, 5 parking podium levels, 15 commercial (office) floors, an amenity lounge floor for office staff, 22 residential floors and a rooftop — 43 floors above ground, matching the “G+43 mixed-use tower” in the DLD filing. The filing counts 1,382 units; the launch data does not split them between apartments, offices and retail.

**What is the service charge?**

Broker launch data lists a service charge of 25 without a unit. Ask the developer for the confirmed rate, its unit and whether residential and office owners pay the same figure.

**Where is The WOW Tower?**

In Dubailand Residence Complex (DLRC), the district along the Al Ain Road and Emirates Road in eastern Dubai. DLD files it under the register area Wadi Al Safa 5. The launch data gives no travel times from the tower itself.

Explore more

## Related pages

[Dubailand Residence Complex](https://wizipremium.com/areas/dubai-land-residence-complex.html) [Studios in Dubai](https://wizipremium.com/buy/studios-dubai.html) [Offices and shops in Dubai](https://wizipremium.com/buy/commercial-property-dubai.html) [Off-plan payment plans](https://wizipremium.com/dubai-off-plan-payment-plans.html) [Empire Jebel Ali](https://wizipremium.com/projects/empire-jebel-ali-empire-developments.html) [Soulever by Beyond](https://wizipremium.com/projects/soulever-beyond-dubai-maritime-city.html) [All Dubai projects →](https://wizipremium.com/projects.html)

Get started

## Ask about The WOW Tower

Tell us what you are after — a studio, a 1- or 2-bedroom, or an office — and your budget. We will reply with the matching lines of the launch price list, the payment plan that fits and the sales date once Mr. Eight announces it.
