# Handover & snagging in Dubai — check before you sign

Your tower is finally ready. What happens in the next 30 days decides whether defects are the developer's problem or yours. Here's the room-by-room checklist, the legal deadlines that protect you, and the one rule that matters: don't sign until it's fixed — or the fix is in writing.

The checklist

🛡 RERA-licensed 📊 Law 6/2019 liability framework ⏱ Reply within 1 hour

10 yrs

developer liability for structural defects

1 yr

liability for MEP (mech/electrical/plumbing)

5%

escrow retention held for a year after completion

~30 days

typical window for handover formalities

Updated 20 July 2026 · By [WIZI Advisory Team](https://wizipremium.com/about.html) · RERA ORN 60234

Quick answer

## Snag first, sign second. The law gives you real leverage — but only before acceptance.

Handover is a legal moment, not a key ceremony. When your developer issues the completion notice you typically get ~30 days to settle final payments and formalities — inside that window, do the snagging inspection before signing anything . Defects documented before acceptance are the developer's to fix; sign a clean handover certificate and you've accepted the unit as-is, keeping only the statutory protections: under Law 6 of 2019 the developer remains liable 10 years for structural defects and 1 year for mechanical, electrical and plumbing from the completion certificate, and 5% of the project's escrow is retained for a year to fund warranty fixes. The working rule: every material defect closed — or a written rectification plan with dates — before your signature.

Room by room

## The snagging checklist — room by room

Two hours with this list beats two years of arguing. Bring a phone charger (sockets), a bucket (drainage) and patience:

| Zone | What to check | Red flag |
|---|---|---|
| Walls, floors, ceilings | Cracks, hollow tiles (tap them), paint runs, level floors, aligned skirting | Hairline cracks over door frames; hollow-sounding tile clusters |
| Doors & windows | Open/close/lock every one; seals, alignment, glass scratches, balcony door drainage | Doors that catch or don't latch; condensation between glass panes |
| Plumbing | Run every tap hot+cold, flush toilets, fill+drain tubs/sinks, check under-sink joints, water pressure | Slow drainage, hammering pipes, damp cabinet bases |
| Electrical | Every socket (charger test), every switch, DB board labelling, AC thermostats, bell, intercom | Warm sockets, tripping breakers, unlabelled DB |
| HVAC | Cooling in every room, airflow at grilles, noise levels, filter access, thermostat response | One room noticeably warmer; rattling ducts |
| Kitchen & appliances | Run every appliance a full cycle where possible; hood extraction; cabinet alignment and soft-close | Appliances that power on but don't complete cycles |
| Bathrooms | Grout and sealant lines, shower drainage slope, exhaust fan pull, water heater | Water pooling away from the drain; missing sealant behind fittings |
| Balcony & façade side | Drainage outlets, balustrade stability, door threshold sealing, external finish | Standing water after a bucket test; loose balustrade |
| Documents & meters | DEWA meter numbers vs contract, chiller/gas registration, warranty cards, parking bay number | Meter numbers that don't match the unit |

Defects documented at inspection stay on the developer's rectification list even after you move in — photograph everything with date stamps and keep one signed copy of the snag list.

The handover sequence

## The handover sequence — what happens when

From completion notice to title deed, in the order it actually happens:

| Step | What happens | Watch for |
|---|---|---|
| 1 · Completion notice | Developer notifies: unit ready, final instalment due | The ~30-day clock starts; book snagging immediately |
| 2 · Final payment & fees | Last instalment + DLD 4% (if not paid at Oqood) + admin fees | Get the exact settlement statement in writing first |
| 3 · Snagging inspection | Your inspection (or hired snagger) documents every defect | Do it BEFORE signing the handover certificate |
| 4 · Rectification | Developer fixes documented snags; you re-inspect | Agree dates in writing; re-check every closed item |
| 5 · Handover certificate | You sign acceptance and receive keys and access cards | Signing = accepting current condition (minus hidden defects) |
| 6 · DEWA, chiller, Ejari | Utilities registered in your name; move-in permits from the OA | Chiller deposits and move-in booking can take days — plan |
| 7 · Title deed | DLD issues the deed; unit exits Oqood into full ownership | Check every name spelling and the area figure on the deed |

Sign or don't sign

## Sign — or don't sign yet

### Safe to sign when

- Every material snag is fixed and re-inspected — or listed in a written, dated rectification plan
- The snag list is signed by the developer's representative, and you keep a copy
- Meters, parking bay and unit number match the contract paperwork
- You've photographed the unit's condition with date stamps
- The settlement statement matches the SPA — no surprise «admin» lines

### Don't sign yet if

- «Sign now, we'll fix later» — with nothing in writing
- Water, electricity or AC can't be tested (no supply connected yet)
- Structural-looking cracks, leaks or drainage failures are unresolved
- The developer's rep won't countersign your snag list
- You're being charged fees that aren't in the SPA or fee schedule

Your legal protections

## Your legal protections — and their clocks

Dubai's framework gives off-plan buyers two statutory warranties under Law 6 of 2019: the developer answers for structural defects for 10 years from the building's completion certificate (foundations, load-bearing elements, waterproofing failures of the structure) and for mechanical, electrical and plumbing defects for 1 year. Separately, 5% of the project escrow stays retained for a year after completion — money that exists specifically to fund warranty rectification. Hidden defects — things no reasonable inspection could catch — remain claimable within the liability periods even after you've signed.

The practical hierarchy: document before acceptance (strongest position — the developer needs your signature), warranty claims inside year one (strong — the escrow retention is live), structural claims within ten years (solid but slower), and disputes through RERA/RDC if the developer stalls. Every step gets weaker without paperwork — the signed snag list and date-stamped photos are your case file.

DIY vs professional snagging

## DIY or professional snagger?

A careful owner with this checklist catches most visible defects. A professional snagging company brings thermal cameras (hidden leaks, missing insulation), socket testers, moisture meters and — importantly — a report format developers take seriously; typical cost runs from around a thousand dirhams for an apartment, scaling with size. Our honest take: DIY is fine for a mid-market apartment you'll live in; hire a pro for villas, penthouses, and any investor purchase you won't personally occupy — you won't be there to notice the slow leak in month three. Either way, re-inspect after rectification: a «closed» snag is a claim until you've seen it fixed.

FAQ

## Common questions

**What is snagging in Dubai property?**

The pre-acceptance inspection of a newly completed unit, documenting every defect — from paint runs to failed drainage — before you sign the handover certificate. Documented snags are the developer's to rectify; a clean signature means accepting the unit as-is, leaving only statutory warranties (10-year structural, 1-year MEP).

**How long is the defect liability period in Dubai?**

Under Law 6 of 2019: 10 years for structural defects and 1 year for mechanical, electrical and plumbing, both from the completion certificate. Additionally, 5% of the project's escrow is retained for a year after completion specifically to fund warranty fixes. Hidden defects remain claimable within these periods even after acceptance.

**Can I refuse to sign the handover certificate?**

You can — and should — withhold signature while material defects are open, asking instead for rectification with written dates. What you can't do is use snagging to delay indefinitely or skip final payments: the ~30-day formalities window still runs. The balanced play: sign once every material item is fixed or committed to in writing, with your snag list countersigned.

**What happens if I find defects after moving in?**

Within year one, MEP defects (leaks, electrical faults, AC failures) are still the developer's to fix — backed by the 5% escrow retention. Structural issues are covered for 10 years. Report in writing, reference the liability period, keep copies. What's genuinely lost after acceptance: cosmetic items you could have caught at snagging.

**How much does professional snagging cost in Dubai?**

Typically from around AED 1,000 for an apartment, scaling with size and scope (villas and penthouses more); thermal imaging and moisture testing are usually included at the professional tier. Against a seven-figure purchase and a possible hidden leak, it's the cheapest insurance in the process — but a careful DIY inspection with a structured checklist covers most visible items.

**Do I pay anything at handover?**

Yes: the final instalment per your payment plan, the DLD 4% if it wasn't paid at Oqood registration, admin fees, plus utility setup (DEWA deposit, chiller registration) and the first service-charge period. Get the developer's settlement statement in writing before the appointment — surprise lines at the trustee office are negotiable only before you've paid them.

Keep reading

## Off-plan money guides

[Off-plan: how it works →](https://wizipremium.com/buy/off-plan-dubai.html) [Payment plans compared →](https://wizipremium.com/dubai-off-plan-payment-plans.html) [Taxes & fees at purchase →](https://wizipremium.com/dubai-property-taxes.html) [Service charges start at handover →](https://wizipremium.com/dubai-service-charges.html)

### Get your handover checked properly

Tell us the project and handover date — we'll walk the unit with you or on your behalf, log the snags against the developer's own spec, and track the fix list until it is closed.